![]() |
| About the factory | Production | Русский |
|
Production > Power engineering > Cogeneration gas turbine power plant КГТЭС-1500 Cogeneration gas turbine power plant КГТЭС-1500Purpose
Cogeneration gas turbine power plant КГТЭС-1500 is designed to be used as main and reserve-peak source of the alternating three-phase current with frequency of 50 Hz, voltage of 6.3 kV (possible versions are 0.4 kV and 10.5 kV) for the fixed and quickly installed systems of constant power supply for certain villages, enterprises, medical institutions and hotel complexes located in regions with various climatic conditions, and also for supplying them with hot water. It can be used at the compressor plants for the main gas pipelines and oil fields for supplying gas production and transportation areas with electricity and hot water. КГТЭС-1500 can work both singly and together with the power system or similar sources of electric power. On the basis of several power-generating units the power plant with the heat power source of greater capacity with common control unit can be formed. Design
КГТЭС-1500 comprises: Power unit consisting of: - gas turbine generator ГТГ-1500-2Г; - local control desk for GTG; - set of equipment for self-contained power supply of GTG control system; - set of equipment for GTG start-up; - set of electrical equipment of automatic excitation of generator; - auxiliary equipment; - set of electric control equipment for waste heat exchanger; - operator’s cabin. Waste heat unit consisting of waste heat exchanger mounted on the girder with platforms for waste heat exchanger maintenance. |
| ОАО Пролетарский завод © 2007 :: Производство сайта: Myworks.spb.ru |